Extension of Duration of planning permission reference 19/966 for sub-division of existing site and construction of bungalow and all associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
15 Grove Court , Tramore , Co. Waterford
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 670 nearby planning records within 5 km where a location match is available.
- Matched source
- 19966
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Sub-division of existing site and construction of bungalow and all associated site works
For the following ground level domestic extending works: 1) an extension to the side of the building, 2) an extension at the rear of the building, 3) an entrance porch to the front of the building and all associated ancillary site works
For construction of a new garage and garden storage to the side of the existing property together with associated site works
For construction of a new single storey extension to side (replacing existing storage shed to be removed) and rear of an existing single storey dwelling and all ancillary site works
RETENTION PERMISSION of the boundary wall as constructed. PLANNING PERMISSION for the construction of a single storey porch to the front of the existing detached dwelling
The brief summarizes the pattern across all 670 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 19966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief