Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 432 decisions within 5 km, 1 exact-site or onsite candidate record, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A dwelling house, detached domestic garage, new entrance walls, installation of mechanical aeration unit with polishing filter system and all associated site works
Detached domestic shed with adjoining stable/ bike shelter, a detached music room and all ancillary site works
A new dwelling house, detached garage, site entrance, wastewater treatment system, percolation area and all associated site works
Construction of a livestock underpass, effluent holding tank and all associated siteworks
The construction of an easy feed slatted cubicle house with underground slatted tank, feed barriers, feed passage, ancillary concrete and walkway, and all associated ancillary site works at our farmyard
The construction of a dwelling, garage, entrance, effluent treatment system and all associated site works
The brief summarizes the pattern across all 432 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19977The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief