Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 207 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A NEW TREATED WATER STORAGE TANK COMPRISING 1 NO. ABOVE GROUND 17.6M DIAMETER TWIN CELLED PRECAST CONCRETE TANK, ANCILLARY STRUCTURES COMPRISING 1 NO. PARTIALLY BURIED VALVE CHAMBER, 1 NO. DE-CHLORINATION SYSTEM AND ASSOCIATED ABOVE GROUND KIOSK, 1 NO. ABOVE GROUND TELEMETRY KIOSK,1 NO UNDER GROUND CONCRETE SCOUR CHAMBER AND 1 NO. PUMP STATION AND ABOVE GROUND KIOSK AND OTHER ANCILLARY DEVELOPMENT INCLUDING ASSOCIATED UNDERGROUND PIPEWORK AND CABLING, OVERFLOW OUTLET TO ADJACENT DRAINAGE DITCH, EXTENESION TO EXISTING HARD SURFACED INTERNAL CIRCULATION AREA, FENCING, LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS AT TOBAR BHREANDÁIN WATER TREATMENT PLANT AND ADJOINING LANDS
Uisce Éireann intend to apply for A TEN YEAR PERMISSION for development in the townland of Baile an Fheirtéaraigh, Ballyferriter, County Kerry. The development will consist of the following: - 1no. twin-celled precast concrete treated water storage tank and associated retaining wall; -Decommissioning of the existing water reservoir. The top slab shall be removed and infilled with stone chip; -1no. above-ground pump kiosk; - 1no. fully buried valve chamber; - 1no overflow outlet and associated de-chlorination chamber and below-ground chamber; - Installation of by-pass chamber and hydrant for emergency emptying/refilling of the storage tank; - 2no. ground mounted solar photovoltaic panels (one array measuring 24m2 and the other measuring 33m2, all solar panels will be 2.0m above ground level); and -All associated development required to facilitate the proposed development, including associated underground cabling and pipework; extension to existing hard surfaced internal circulation area, internal site road, lighting and drainage, and landscaping.
(A) RETAIN THE HOUSE AS CONSTRUCTED, (B) RETAIN THE HOUSE WITHIN REVISED SITE BOUNDARIES
ALTER & EXTEND THE HOUSE TO THE SIDE & REAR & ALL ANCILLARY SITE WORKS
ALTER AND EXTEND HOUSE TO SIDE AND REAR AND ALL ANCILLARY SITE WORKS
CONSTRUCT A SINGLE STOREY EXTENSION TO THE FRONT AND SIDE TO AN EXISTING DWELLING HOUSE, ALSO TO INCLUDE MINOR ELEVATIONAL CHANGES CONSISTING OF WINDOW AND DOOR OPENING ALTERATIONS AND THE CONSTRUCTION OF AN EXTERNAL BBQ AREA TO THE REAR, ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 207 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201225The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief