Free preview / €49 incl. VAT site brief

Site planning risk brief

Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.
See sample PDF
Opens secure checkout for the €49 incl. VAT site risk brief.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Taghadoe , Maynooth , Co. Kildare

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 1,051 nearby planning records within 5 km where a location match is available.

Matched source
201243
Project type
One-off house
Coverage
5 km radius
1,051Nearby applications
13%Refused
912Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

201243

The construction of a single storey bungalow, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works,

Granted0.0 km21 June 2021
21579

(a) Retention permission for change of use of existing farm building to office use with canteen and WC. (b) Planning permission for new recessed vehicular entrance. Existing entrance to be closed up. (c) Planning permission for new 630sqm shed for agricultural use. (d) Planning permission for new proprietary wastewater treatment system and sand filter percolation area. (e) Planning permission for new surface water management works. Revised by Significant Further Information which consists of submission of a Natura Impact Statement

Granted0.2 km03 May 2022
17959

Construction of a two storey detached type house, one and a half storey detached type domestic garage with loft store, effluent treatment system, and all ancillary siteworks

Granted0.5 km07 March 2018
2560326

For the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works

Refused0.7 km22 May 2025
2460494

For construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); construction of a new 110kV GIS building (68.8m long x 15.4m wide (22m including staircases), 15m in height) (1,138 sqm); both of the GIS Buildings will have 8 no. associated lightning protection spikes / rods on each of the roofs (3m in height); construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts and overhead line and cable works; 3 no. lightning masts (height 22m); cable connections to the 220kV GIS and 110kV buildings; new 4.5m wide internal access road and 10 no. new permanent car parking spaces; associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; associated demolition of existing bungalow farmhouse and agricultural buildings (1,112sqm floorspace total) to facilitate the proposed development; and all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement will be submitted to the Planning Authority with the application

Granted0.9 km15 August 2024
20795

Increasing the number of children catered for from 10 to 14 in line with Early Childhood Ireland ECCE Scheme

Granted1.0 km06 October 2020

The brief summarizes the pattern across all 1,051 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Site-specific risk summary

Site brief

Source evidence

Site brief

Comparable decision set

Site brief

Next-step checklist

Site brief
Ready to get the site risk brief?€49 incl. VAT once-off PDF, no account required