Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 133 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The extension of existing finished product storage yard and all associated site works (this proposed development is within an existing Seveso site(upper tier))
Revised location septic tank, percolation area and domestic garage as constructed
The construction of 1130sq.m solar panel array with an export capacity of approximately 240kwh to be mounted on the roofs of the existing bulk storage stores No 1 & 2 and all associated site works(the proposed development is within an existing Seveso site[upper tier])
An extension of existing storage bays building and all associated site works(this proposed development is within an existing Seveso site[upper tier])
The temporary improvement and upgrade of an existing entrance off the N69 and temporary site offices. The permission for retention includes widening an existing entrance, locating temporary site offices at the compound entrance and undertaking ancillary site works and road markings, making it suitable for a site access for use during the refurbishment works of the Limerick to Foynes Rail Line, which is expected to take 3 years. Thereafter, the site access will revert back to its current use
A replacement dwelling house, garage, entrance, effluent treatment system, percolation area and all associated site works
The brief summarizes the pattern across all 133 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20713The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief