Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 812 decisions within 5 km, 6 exact-site or onsite candidate records, and 100 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched100 structured nearby appeal records.
100 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Single-storey dwelling, on-site effluent disposal system, vehicular access (shared), bored well and all associated site works
Single-storey dwelling, on-site effluent disposal system, vehicular access (shared), bored well and all associated site works
Dwelling as constructed as per the granted permission01/5284 (excluding the front porch). In addition to the granted permission 91/7080, it is requested that the retention of this development be granted in the absence of the burden placed against the entire site by condition 1 of Planning Register Number 91/7080 which restricts the use of the applicants 16.04-acre landholding as agricultural, forestry and bloodstock
Single storey split-level dwelling, on-site effluent disposal system, vehicular access and all associated site works
Additional floorspace to front elevation and change in roof of Granny Flat to the west of the site. The application includes for a waste water treatment system, clarifying outstanding issues of application 616/99. The application also requests planning permission to raise boundary wall to public footpath to the east by an average of 700mm
A development at a site bounded to the northeast and southeast by Newcastle Hospital, to the southwest by the R772 and to the northwest by No. 27 Killadreenan at Newcastle Hospital, Killadreenan, Newtown Mount Kennedy, Co. Wicklow, a protected structure. The development comprises a COVID-19 testing centre, constructed under emergency dispensation, comprising 18 single storey prefabricated buildings (accommodating a walk-in testing facility, canteens, offices, storage, showers, lockers and toilets), a 3-bay, single storey lightweight drive-in testing building, 9 visitor car parking spaces, 25 staff car parking spaces, 12 bicycle parking spaces, new vehicular and pedestrian entrances off the R772, boundary treatments, signage, site lighting, plant and all associated site works
The brief summarizes the pattern across all 812 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211112The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief