Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 890 decisions within 5 km, 1 exact-site or onsite candidate record, and 69 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
69 structured nearby appeal records.
69 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
House extension to the front, side and rear of the existing house; completion of the front boundary wall; alterations to the existing entrance piers and gate; and all ancillary site development works
Upgrade of existing domestic waste water treatment system, replacing existing soil filter with eco-flo filter
The construction of a detached single storey building comprising a garage, fuel store and home gym ancillary to the existing dwelling, together with all associated incidental and ancillary works
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. Construction of proposed retaining wall, VI. All associated site development works including line marking
Retention of alterations to site boundaries from planning file ref. 15/575
The decommissioning of an existing septic tank system and the construction of a replacement wastewater treatment system and all ancillary site works
The brief summarizes the pattern across all 890 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211311The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief