Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 302 decisions within 5 km, 5 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development will consist of: (1) Conservation and conversion of an existing warehouse (Protected Structure RPS ID No. 3120), into 4 no. Apartments (2) Construction of 6. no houses creating a terrace along Harbour lane (3) Construction of a new 2 storey building fronting onto Harbour road consisting of 4 no. apartments. (4) Provision of a utility storage unit and communal amenity space within the site, along with all ancillary works. This application relates to works to a Protected Structure. Gross floor space of proposed works is 834.8 sqm.
For the use of an existing building as a place of worship and youth/advise centre. Gross floor space 308 sqm.
For: 1. Reconfiguration of existing parking area and installation of 1no Automatic Brush Wash unmanned facility with associated screening and signage, 2. Construction of 1no Car Wash Plant Room structure (circa 10.3 m2) with water recycling system and surrounding timber fencing enclosure, 3. Installation of 4 no new EV charging spaces with 4 no charging units, 2 no EV payment terminal units with associated Power Unit cabinet infrastructure and permeable paving surfacing and road markings, 4. Reconfiguration of the existing car park layout with new kerbing and road markings to accommodate one-way egress through proposed car wash area and access to proposed EV Charging spaces island, 5. Relocation of existing 1no Air/Water Unit and 1 no. Vacuum Unit on raised island with associated signage, 6. Installation of 200 sq. m of solar panels on existing canopy roof with associated fall arrest system and electrical installations, 7. All associated site development works including drainage, infrastructure lighting and line marking. Gross floor space of proposed works: 10.3 sqm
For outdoor terrace area as constructed and all associated site works
For the demolition of an existing shed and construction of a self-contained "granny flat" to the rear of existing dwelling together with construction of a new shed and all associated site works. Gross floor space of proposed works: 83 sqm. Gross floor space of any demolition: 45 sqm
For revisions to approved development (Ref No. 12/9024) comprising the construction of 17 no. single-storey terrace houses and a communal facilities building for older people. The proposed revision comprises: omission of the approved communal facilities building and the addition of 1 no. single storey one-bedroom dwelling and associated site development works
The brief summarizes the pattern across all 302 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211414The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief