Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Railpark , Celbridge Road , MaynoothOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Railpark , Celbridge Road , Maynooth

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The site check found 1,268 decisions within 5 km, 5 exact-site or onsite candidate records, and 107 structured appeals.

Matched source
21155
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

5 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

107 structured nearby appeal records.

107 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

1,268Nearby applications
5Site-linked candidates
10%Nearby refused
107Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

21155

Development on this 2.18 ha site, approximately, at lands adjoining an existing residential development (Rockfield Park), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 1 of a residential masterplan for some 105 no. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase 1 development will consist of: Construction of a residential development comprising 58 no. dwellings in total, consisting of 18 no. two-bedroom two storey houses, 14 no. three-bedroom three storey houses and 2 no. four-bedroom three storey houses (34 no. houses in total) including rear private open spaces; 12 no. one-bedroom apartments and 12 no. two-bedroom apartments (24 no. three storey duplex apartments in total), including balconies. The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road; a new pedestrian footpath and cycle track along the main site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the northeast (Phase 2), northwest and the southeast; works to facilitate connections to existing services infrastructure to the northeast via Phase 2 lands. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, and bicycle store areas; parking at surface level (117 no. total spaces for car parking and 30 no. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road, changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground

Granted0.0 km14 January 2022
2560231

For amendment of the design of the Crèche granted under planning permission 21/155, retaining the granted plan, but reducing the overall roof height. Revised by Significant Further Information which consists of the correction of the planning register number being applied to amend, now 21/156 in place of 21/155, and the revised design of the creche in response the request for further information from Kildare County Council

Granted0.0 km22 August 2025
23705

Of an existing 19m2 shed and an existing 12m2 freestanding utility room/WC constructed to the rear of the existing 2-storey end of terrace dwelling and all associated ancillary site development works above and below ground

Granted0.1 km14 August 2023
21156

Development on this 1.99 ha site, approximately, at lands adjoining an existing residential development (Rockfield Court), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 2 of a residential masterplan for some 105 No. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase II development will consist of: Construction of a residential development comprising 47 No. dwellings in total, consisting of 11 No. two-bedroom two storey houses and 10 No. three-bedroom three storey houses (21 No. houses in total) including rear private open spaces; 13 No. one bedroom apartments and 13 No. two-bedroom apartments (26 No. three storey duplex apartments in total), including balconies and a single storey crèche facility (c.261 sqm). The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road via currently undeveloped lands to the southwest (Phase 1); a new pedestrian footpath and bicycle track along the site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the southwest (Phase 1), north and the southeast; works to facilitate connections to existing services infrastructure in Rockfield Park to the west. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, children’s play area and bicycle store areas; parking at surface level (95 No. total spaces for car parking and 33 No. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road; changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground

Granted0.1 km14 January 2022
24137

For extended vehicle access to front with planning permission to reduce the vehicle access with block wall and block pillars to 4.68m to match all with ancillary works

Granted0.1 km19 June 2024
21664

A 5m high concrete hurling wall and 5m high ball stop fence to the rear of the existing school site and associated sundry other site works

Granted0.1 km06 July 2021

The brief summarizes the pattern across all 1,268 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required