Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
33% of nearby decided applications were refused. The site check found 209 decisions within 5 km, 4 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
(a) Construction of a new three-bedroom dormer style dwelling; (b) Single storey domestic garage; (c) Packaged wastewater treatment system and percolation areas; (d) Alterations to an existing vehicle entrance to provide a new double recessed vehicle entrance, along with all facilitating and associated site development works
(a) construction of a new three-bedroom dormer style dwelling, (b) single storey domestic garage, (c) packaged wastewater treatment system and percolation areas, (d) alterations to an existing vehicle entrance to provide a new double recessed vehicle entrance, along with all facilitating and associated site development works. Revised by significant further information which consists of relocation of the proposed dwelling and packaged wastewater treatment system and percolation areas to the north-west of the original site closer to the existing parental home.
A) construction of a new three-bedroom dormer style dwelling, B) Single storey domestic garage C) Packaged wastewater treatment system and percolation areas. C) Alterations to and existing vehilce entrance to provide a new double recessedvehicle entrance, along with all facilitaitng and associated sitedevelopment works.
(a) Construction of a new three-bedroom dormer style dwelling. (b) Single storey domestic garage. (c) Packaged wastewater treatment system and percolation areas. (d) New recessed entrance. Along with all facilitating and associated site development works
(a) Demolition of existing derelict vernacular type cottage; (b) Erection of replacement two storey 4 bedroom farm house; (c) The installation of proprietary wastewater treatment plant with percolation area to serve the proposed house and the stable block granted under 16/792; (d) Relocation of existing entrance onto the public road in the interest of traffic safety, and all associated site works
Of modifications to an established anaerobic digestion facility as follows: 1. Modifications to gas upgrading plant consisting of: (i) Relocation of Gas Compressor within the footprint area; (ii) Externally located chillers and H2S filters; (iii) CO2 recovery and collection system enclosure. 2. Biogas Boiler enclosures and Pasteurisation Plant Biofilter Enclosure located on a mezzanine floor Plant Room No. 1. 3. Waste Compactor enclosure located at the eastern end of the reception building. 4. Solid and semi-solid biomass feedstock intake structures located at the eastern end of the reception building. 5. Biofilter enclosure at north-east corner of reception building. 6. Geomembrane Manure Storage Basin. 7. Biogas Scrubbing Vessels, storage tank and fire water store. 8. Tipping enclosure over trailer tip and liquid intake bay. 9. Enclosure extension over pasteurisation equipment
The brief summarizes the pattern across all 209 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211662The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief