Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,367 decisions within 5 km, 2 exact-site or onsite candidate records, and 201 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
201 structured nearby appeal records.
201 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A temporary period of up to 5 years for the development of 3no. hydrokinetic turbines, associated anchors and marker buoys upstream of Thomond Weir in the River Shannon, a junction box and cable carrying metal conduit along a section of Thomond Weir, connection of the cable to the ESB building on Brown's Quay, placement of power conditioning and power storage unit within the building and the placement of a portacabin in the grounds of the ESB building at Brown's Quay, Limerick City. The project will be for 24 months. A Foreshore Licence Application has been submitted for this development. An Environmental Impact Screening Report, an Ecological Impact Assessment Report and a Natura Impact Statement accompanies this application
Extension to rear of house
The construction of a residential development of 46 No. apartments consisting of the following: 1 No. four store apartment block consisting of 23 No. 1-bed apartments, 14 No. 2-bed apartments and a community room. 1 No. three storey apartment block consisting of 9 No. 2-bed apartments. Permission is also sought for the construction of an ESB sub-station, switch room, bin store, bicycle store, landscaped bio-diversity park, external water tank & heat pump units, surface water attenuation swale, connections to existing drainage & water supply network along with all associated site works. A Natura Impact Statement(NIS) accompanies this application
The vehicular entrance, the extension at the side & front of the house, the kitchen extension to the rear of the house and other associated site works
Existing independent living unit and Planning Permission for minor alterations to the unit
Construction of 6 no. terraced town houses (five three bedroom and one two bedroom dwelling), associated parking, realign public roadway on the northern boundary of the site and all ancillary services and associated site works
The brief summarizes the pattern across all 2,367 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211669The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief