Development consisting of the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Sroove , Monasteraden , County Sligo
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
2% of nearby decided applications were refused. The preview found 82 nearby planning records within 5 km where a location match is available.
- Matched source
- 21461
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
1. Construction of a single storey type dwelling 2. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice 3. All associated site development works
(1) the construction of a new dwelling house (2) new garage (3) a new effluent treatment system and percolation area (4) formation of a new site entrance (5) and all associated site works
Development consisting of the retention of an existing 36m high telecommunications support carrying antennas and link dishes together with ground based equipment, security fencing and access track
Development consisting of the construction of a new dry shed and all associated site works.
Development consisting of the revised dry shed design and all asssociated site works as previously granted under PL19/286
The brief summarizes the pattern across all 82 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 21461The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief