Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Behybaun , BallinaOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Behybaun , Ballina

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

6% of nearby decided applications were refused. The site check found 647 decisions within 5 km, 4 exact-site or onsite candidate records, and 34 structured appeals.

Matched source
221145
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

4 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

34 structured nearby appeal records.

34 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

647Nearby applications
4Site-linked candidates
6%Nearby refused
34Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

221145

Construction of a new car display yard, 3 no. pre-fabricated office buildings (59.610m2 in total), together with new effluent treatment system to serve proposed development and adjacent motor dealership buildings and all ancillary site development works

Granted0.0 km03 August 2023
2611

Construction of proprietary effluent treatment system together with all associated site works

Refused0.1 km20 March 2026
17629

RETAIN EXISTING FIRST FLOOR LEVEL CONSISTING OF OFFICE AND ANCILLARY STAFF ROOMS. EXISTING EXTENSION LOCATED TO THE REAR OF THE EXISTING WORKSHOP MINOR CHANGES TO ELEVATIONS TO THAT GRANTED UNDER P99/2046

Granted0.1 km05 March 2018
21470

RETENTION OF EXISTING CONSERVATORY AND DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS

Granted0.2 km30 June 2021
19215

CONSTRUCT A LIGHT WAREHOUSE TYPE EXTENSION 590SQM TO THE REAR OF THE EXISTING LIGHT COMMERCIAL TYPE UNIT ALONG WITH AN ADJUSTMENT TO THE EXISTING SWINGING TYPE ENTRANCE GATES TO A SLIDING TYPE ENTRANCE GATE, DEMOLITION OF EXISTING LEAN TO TYPE BUILDING TO THE REAR OF THE MAIN WAREHOUSE BUILDING ALONG WITH ANY OTHER ANCILLARY SITE WORKS ATTACHED TO THE PREVIOUSLY GRANTED P97/465 AND P98/1770

Granted0.2 km24 October 2019
2550

Retain dwelling house, domestic sheds, front boundary wall and detached granny flat including all existing site works

Granted0.3 km24 September 2025

The brief summarizes the pattern across all 647 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required