Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,316 decisions within 5 km, 5 exact-site or onsite candidate records, and 269 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched269 structured nearby appeal records.
269 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(i) change of use of portion (539sqm) of existing agricultural shed to small scale brewery shed and on site effluent treatment system. (ii) change of use from office (115sqm) to Public Brewery Experience Centre with Arthur's Barn Building and all associated site works
Change of use of existing agricultural building to toilets, administration offices, stores, kitchen and café area, changes to building elevations, provision of external parking areas, installation of onsite effluent treatment system and all associated site works
(i) retention permission for use of existing agricultural outbuildings for bicycle hire facility and 2 no. containers for storage. (ii) Retention permission for use of Tram Shed as site office. (iii) Retention permission for use of land (overflow carpark 2 & 3) for carparking. (iv) Full permission for extension of overflow carpark 2 and all associated site works
A proposed two-storey extension to the northern facade and internal modifications to the existing development, which will include a new kitchen location, utility room on the ground floor, and ensuite bathroom on the first floor, along with all ancillary and associated site works necessary to complete the development
(i) retention permission for existing stable block, 147sqm (ii) full permission for home office extension, 33sqm, to rear of existing stable block and all associated site works
Full Planning Permission for the following 1. The demolition of existing dwelling as constructed 2. The construction of a new A-rated replacement dwelling, proposed new entrance gates and side walls for privacy, revised driveway and modifications to existing garage on site being retained and all associated site works with existing services, treatment system and percolation areas on site to be retained on site.
The brief summarizes the pattern across all 2,316 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221237The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief