Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 532 decisions within 5 km, 8 exact-site or onsite candidate records, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Protected structure a) demolition of non original single storey extension and garden shed to side and rear (64.9sq.m), b) Internal alterations to remove non-original internal walls and wall linings and reinstatement with traditional materials, c) replacement of non original windows and replacement with 1 over 1 sash windows d) rethatching of original thatch structure. e) Part single (74.2sq.m) / part first floor dormer (30.8sq.m) extension to rear with associated solar panels and roof lights f) demolition of existing vehicular entrance, relocation and reconstruction with new entrance, wall and vehicular gate and g) all ancillary site and landscape works
Modifications to slated canopy over front door of cottage. Retention of removal of brick chimney and its replacement with lime plastered chimney. Removal of existing concrete floor and replacement with new insulated lime floor. Installation of new fire-rated ceiling to interior of cottage. Removal of existing cottage front door and replacement with painted timber glazed half door and frame. New internal doors to cottage. New timber clad, timber frame wall and window in place of missing rear wall of cottage. New loft bed in cottage. Change of design of two-storey extension to rear (as granted in planning ref: 221406) to a modified design with glazed link hallway to connect cottage to extension, modification to thatch at rear to accommodate link. Reinforcement of front boundary hedge with native species planting. New electrics to interior of cottage and ancillary site works as described on the drawings
Sunroom to side of dwelling, kitchen and utility room extension to rear of dwelling, side window in lieu of door, domestic garage / she with car port and associated works
Dwelling as constructed on site which was granted under planning ref 18/10, the changes include change of roof material from metal to black slate and roof angle, removal of attic room and roof, lowering of level of first floor level floor and windows on first floor level and associate works
Part single storey, part two storey dwelling with attic level above, and relocation of existing vehicle entrance with all necessary ancillary works to facilitate the development
Single storey detached garage (60.m.sq.) located to the north of the dwelling and associated driveway and site works
The brief summarizes the pattern across all 532 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221406The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief