Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 986 decisions within 5 km, 1 exact-site or onsite candidate record, and 86 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
86 structured nearby appeal records.
86 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The development consists of the retention of the recently installed single storey prefabricated office building (floor area of 119.4 sqm) and all associated site works to the south of Building 2A on the western side (facing Old Great Connell Road to the west of the Pfizer site) of the Pfizer campus
For a one storey extension to the side of the existing one storey detached house, demolish existing garage and all associated site works
For the construction of a new single storey entrance lobby extension to be located underneath the existing single storey roof/canopy at the main entrance located to the front of Building 1 (facing onto the R445 Newbridge to Naas Road) together with all associated siteworks
For (a) the conversion of the existing detached garage to living accommodation with new single storey link to main dwelling (b) the conversion of the existing attic space to habitable accommodation with the removal of the existing chimney stack to the rear to accommodate new rear dormer and 1no. rooflight to the front of the existing roof. (c) Widening of the existing vehicular access to the front. (d) The development is to include for internal alterations, all associated site works, landscaping and drainage
A converted single storey 38sqm storage shed to the rear of the property, into a 1-bedroom stand-alone granny flat, with all associated site works
For a front, side & rear, two storey extension and rear single storey extension to an existing two storey semi detached dwelling, associated alterations to all elevations, foul water to mains foul water sewer, surface water to soakaways and demolition of existing semi detached garage all at no.4 Great Connell. Alterations to remaining neighbouring garage roof, associated alterations to neighbouring garage elevations all at no.5 Great Connell and all associated site works
The brief summarizes the pattern across all 986 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221441The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief