Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 948 decisions within 5 km, 7 exact-site or onsite candidate records, and 71 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
71 structured nearby appeal records.
71 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) Retention of existing tarmac area for use as a tennis court, 2) Permission for the construction of 3 x new 11m high tennis court lights with poles to mimic existing lights and poles, 3) Permission for a new pedestrian only entrance to the north western end of the tennis club including associated site works. Significant further information/revised plans submitted on this application
Retention permission of existing telecommunications equipment on existing floodlight structure, along with full planning for a 3m extension above existing floodlight structure to provide new telecommunications antennas, cabinets, fencing, ancillary communications equipment and all associated site works. Significant further information/revised plans submitted on this application
The removal of existing gates, and construction of new entrance gateways to the Jamestown Sports Campus on west boundary fence at The Avenue, all internal paving, and associated siteworks. Significant further information/revised plans submitted on this application
The construction of new entrance gateway on north boundary fence, opposite Mill Tree Way, and associated siteworks
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land adjacent to the existing running track in the western part of the Ratoath Community Sports Complex, The Avenue, Jamestown, Ratoath, Co. Meath
The construction of a new single storey detached garage to the side of the existing house and all associated site works
The brief summarizes the pattern across all 948 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221454The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief