Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 833 decisions within 5 km, 5 exact-site or onsite candidate records, and 73 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
73 structured nearby appeal records.
73 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The replacement of the existing septic tank with a new proprietary waste-water treatment plant (Sepcon BAF) and polishing filter coupled with an infiltration bed together with all associated site and development works
(1) the construction of a new fully permeable all weather 3m wide walkway surrounding the grass surface playing pitches, linking to the clubhouse, including lighting to perimeter edges of walkway, and all associated site works, all lighting facilities associated with the above project are for the purposes of training/walking in the hours of darkness, (2) the construction of an extension to the existing multi-purpose all weather training pitch including new lighting columns and all associated site works and services, all lighting facilities associated with all of the above training pitch are for the purposes of sports training/playing in the hours of darkness, (3) the construction of new 3m wide tarmacadam surface "driving strips" on the existing permeable surface car parking area (parking bays/aprons to remain fully permeable surfaces) together with all associated site and development works. Revised by Significant Further Information which consists of (a) the submission of a bat assessment and (b) a revision on the layout of the walkway and alterations to the lighting design
The development will consist of reorientate two existing natural grass rugby pitches within the club grounds. As part of this development, the existing floodlighting infrastructure will be reorientated, upgraded, and aligned with the new pitch layout. In addition, it is proposed to install new floodlighting on the main rugby pitch to achieve lux levels suitable for evening training and competitive nighttime matches at The North Kildare Sports Club,
The construction of a new detached building incl. a Multi-Sport Hall, changing rooms, toilet facilities and ancillary rooms to rear of existing sports related buildings linked by means of an open canopy, together with all associated site and development works
(a) Single storey building for use as a social farming and educational centre; (b) Connection into the existing foul sewer, with car parking/drop off area all being served by the existing avenue and existing entrance
(a) Retention permission for shed for agricultural use; (b) Retention permission for a concrete yard; (c) Retention permission for vehicular entrance and access drive way and all associated site works
The brief summarizes the pattern across all 833 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221487The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.