Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,867 decisions within 5 km, 3 exact-site or onsite candidate records, and 261 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
261 structured nearby appeal records.
261 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Modification to a previously granted development (Ref: 19/1285): Erection of 41 No. new (up to) 6m high lighting columns around car parking area. Minor modification to existing raised median along Green Lane (off the R449) at the site entrance and minor modifications to the site entrance. Replacement of the existing entrance gate with a new sliding gate and pedestrian gate and all associated site development works at St. Mary's GAA Grounds, Green Lane. The modification will incorporate the use of a part of the site as a park and ride car park facility
New surfacing and line marking to existing hard stand car parking area including new bus parking and footpath. Erection of 41 No. new (up to) 6m high lighting columns around car parking area. Minor modifications to existing raised median along Green Lane (off the R449) at the site entrance and minor modifications to the site entrance. Replacement of the existing entrance gate with a new sliding gate and pedestrian gate. All associated site development works
A new 330kV generator, diesel tank and switchboard with 2.4m high perimeter fencing enclosure. All associated site works.
Partial demolition of the single storey element to the west end of the overall Crèche and Montessori use building and for the provision of a larger, 3 storey extension, incorporating 3 classrooms on each of the ground and first floors for Crèche and Montessori use and the provision of 2 No. residential apartments to the second floor comprising of two No. 3 bedroom apartments. Works to include associated lift/stairwells/manager's office, site development works and services connections. All
For erection of a coffee and food-snack container and all ancillary site works
A two storey creche with 5 no. childcare rooms providing a total capacity of 81 no. childcare places with a total floor area of 352 sq.m together with ancillary kitchen, staff facilities, managers office, storage and circulation areas, an external play area, car parking, boundary treatments, landscaping, connections to services and all ancillary site works. The proposed development replaces the creche previously permitted on his site which was granted permission under PL 09.247909 (KCC reg. ref. 16/282). Permission is also sought for the amendment of condition no. 10 of PL 09.247909 (KCC reg. ref. 16/282) to allow the proposed creche be completed and ready for occupation prior to the completion of 155 no. residential units. All
The brief summarizes the pattern across all 1,867 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221525The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief