Applications tied to the site
Partial coverage19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,182 decisions within 5 km, 19 exact-site or onsite candidate records, and 123 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
123 structured nearby appeal records.
123 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RENOVATE AND EXTEND EXISTING DISUSED DWELLING AND CONSTRUCT NEW DWELLING
(1) CHANGE THE USE FROM OFFICES TO ST JOHN OF GODS KILLARNEY DAY SERVICES CENTRE, (2) DEMOLITION OF LEAN-TO STORAGE STRUCTURE, (3) INSTALLATION OF NEW WINDOW AND DOOR, (4) INTERNAL ALTERATIONS, SIGNAGE AND ALL ASSOCIATED SITE WORKS
FOR (1) CHANGE OF USE OF FORMER GARDA BARRACKS AND FCA HALL, TO OFFICES, (2) INTERNAL AND EXTERNAL ALTERATIONS, SIGNAGE AND ALL ASSOCIATED SITE WORKS. THIS IS A PROTECTED STRUCTURE (RPS REF. NO. KY-66-8-86)
ERECT TRADITIONAL SHOP FRONT WITH SIGNAGE
CHANGE OF USE OF NO.35 NEW STREET, FROM DENTAL SURGERY TO OFFICE/CONSTITUENCY OFFICE
RETAIN PART OF THE SINGLE STOREY FLAT ROOFED ANCILLARY AREAS AT THE REAR OF THE DENTAL PRACTICE PREMISES, RE-MODEL THE EXISTING PREMSISES INTERNALLY, DEMOLITION OF INTERNAL STRUCTURAL ELEMENTS INCLUDING THE CHIMNEY BREAST ON THE PARTY WALL AND THE ASSOCIATED CHIMNEY STACK OVERHEAD, ALL ASSOCIATED WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
The brief summarizes the pattern across all 1,182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22916The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief