Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 949 decisions within 5 km, 5 exact-site or onsite candidate records, and 83 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
83 structured nearby appeal records.
83 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Duration of Planning Ref. 18/478 which consists of (1) Demolition of the existing covered standbuilding, the club house, the scoreboard and section of the front boundary wall and turnstiles; (2) The construction of a new 2-storey covered stand building, with facilities within the stand, comprising spectator seating, players’ and officials’ changing areas, spectators’ concourses, circulation, toilet areas, first-aid administrative offices, multi-purpose room, VIP/meeting areas, hospitality and bar serving facilities; confectionery/snack-bar facilities, stores, plant room and associated ancillary areas: (3) Modification to external hard and soft landscaping; (4) Alteration to existing boundary treatment/external signage; (5) Alterations to the existing main entrance and provision of a new entrance plaza (adjacent to the public car park off Main Street), incorporating a single storey stand-alone ticket office (30 sqm) and turnstiles with associated hoardings and signage; (6) Re-instatement of access through the existing stone archway on Athgarvan Road, currently block-up, to provide pedestrian access; (7) Works to the playing pitch including the replacement of some of the existing pitch enclosures/ball netting and an increase of the playing field dimensions from 139m x 81.4m to approximately 143.5 x 83m; (8) Provision of new scoreboard; (9) Provision of flood lighting (3 No. lighting columns at 33.5m high and 1 No. column 27.4m high above pitch level); (10) Provision of associated support services and infrastructural works at the County GAA grounds,
Development at County GAA grounds which is to consist of the removal of an existing container and site clearance, provision of a new single storey temporary accommodation building (91sqm) containing new changing rooms and associated plant room, shower and toilet areas, minor alterations to internal site enclosures and associated site and drainage works
(1) Demolition of the existing covered standbuilding, the club house, the scoreboard and section of the front boundary wall and turnstiles; (2) The construction of a new 2-storey covered stand building, with facilities within the stand, comprising spectator seating, players’ and officials’ changing areas, spectators’ concourses, circulation, toilet areas, first-aid administrative offices, multi-purpose room, VIP/meeting areas, hospitality and bar serving facilities; confectionery/snack-bar facilities, stores, plant room and associated ancillary areas: (3) Modification to external hard and soft landscaping; (4) Alteration to existing boundary treatment/external signage; (5) Alterations to the existing main entrance and provision of a new entrance plaza (adjacent to the public car park off Main Street), incorporating a single storey stand-alone ticket office (30 sqm) and turnstiles with associated hoardings and signage; (6) Re-instatement of access through the existing stone archway on Athgarvan Road, currently block-up, to provide pedestrian access; (7) Works to the playing pitch including the replacement of some of the existing pitch enclosures/ball netting and an increase of the playing field dimensions from 139m x 81.4m to approximately 143.5 x 83m; (8) Provision of new scoreboard; (9) Provision of flood lighting (3 No. lighting columns at 33.5m high and 1 No. column 27.4m high above pitch level); (10) Provision of associated support services and infrastructural works at the County GAA grounds,
For the modification to existing pitch lighting, (previously granted under permissions 18/478 and 23/1009), to provide additional luminaires to existing lighting poles to achieve average pitch lighting of 1000Lux for televised GAA matches for a maximum of 6 occasions throughout the year
Alterations to an existing detached bungalow to form a 4 bedroom dormer bungalow, internal alterations and associated alterations to all elevations, surface water to soakaways, foul water to mains sewer and all associated site works
(a) further extension and modifications to previously permitted extension to side (south-east facing) elevation of existing dwelling house. Original extension was previously granted permission under Pl. Ref. 72/249. Modifications include replacing flat roof with lean-to type roof, window and door arrangement, internal layout and an additional c. 6.3 Sq/M of floor space towards the rear, (b) connection to existing site services and all associated development works
The brief summarizes the pattern across all 949 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 231009The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief