Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 41 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Restoration and stabilisation of approximately 220m of riverbank along the Owenmore River where erosion has occured. These works will include the placement of rock armour stone to the lower sections of riverbank, and soft engineering measures to the upper sections of riverbank. The soft engineering measures will include the installation of coir/jute matting and re-vegetation works. A NIS has been prepared in respect of this planning application.
ERECTION OF AN EXTENSION TO THE EXISTING DWELLING HOUSE AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS
Erection of dwelling house, installation of a wastewater treatment system and percolation area, site access onto public road, and to include all other ancillary site services and development works
The development will consist of the of the following, No 1 Renovation of existing workshop / shop, construction of extension to front and rear of existing workshop /shop. No 2 removal of existing fuel pump island, construct new fuel pump island forecourt area and filling station canopy. No 3 Installation of underground bunded fuel tanks and associated pipework etc. No 4 Installation of a totem sign to the south east corner of the site. No 5 Construction of carwash area, car parking area to rear of side of site, EV charging points and associated car parking space, HGV fuel pump area to the east side of the site along with any other ancillary site works required.
CONSTRUCT A DETACHED DWELLING HOUSE, DOMESTIC GARAGE, CONNECTION TO PUBLIC SEWER/MAINS AND ALL ASSOCIATED SITE WORKS
Retain dwelling house and all ancillary site works
The brief summarizes the pattern across all 41 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2330The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief