Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 89 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Renovate and extend the derelict cottage including: demolition of existing poorly constructed extension, rebuilding extension, restoration of historic roof pitch, addition of roof lights, off road parking for 2 cars, domestic sewage treatment plant and all associated works
The amalgamation of the PBKS & Derryvoghys GWS's. Consisting of the installation of a 1.7km long, 90mm outside diameter interconnecting pipeline, replacement of circa 0.6km of an existing 3" diameter pipeline with a new 90mm OD section of pipeline, replacement of circa 1.6km of an existing 2" diameter pipeline with a new 63mm OD section of pipeline, replacement of circa 3.7km of an exisitng 2" diameter pipeline with a new 63mm OD section of pipeline. Constructon of a new booster station alongside the proposed interconnecting pipeline. Decommissioning of the replaced section of pipeline within DMA001, 004 & 005 of the Derryvoghy GWS, decommissioning of the existing Derryvoghy source and pumping station, and all associated site development works above and below ground including installation of all necessary valves and chambers. (A NIS will be submitted with the application)
The development will consist of the partial demolition and refurbishment of the existing farmhouse along with the construction of a proposed new two-storey extension to the rear and side, a proposed new front door entrance, separate garage, existing entrance upgrade, new wastewater treatment system, connections to site services, and all associated site works and landscaping.
Renovation and extension to the existing dwelling with demolition of existing garage and construction of a new garage and wastewater treatment system with all associated ancillary site works
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE AND FUEL STORE, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA ALONG WITH ASSOCIATED SITE WORKS.
A) demolition of part of the existing dwelling house, b) construction of a single storey side and front extension to the remaining dwelling house, c) replacement of the existing septic tank with a new proprietary wastewater treatment system and d) all ancillary works on revised site boundaries
The brief summarizes the pattern across all 89 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23340The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief