Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 291 decisions within 5 km, 2 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of wastewater treatment system and all associated site works. The primary alterations to the site as constructed consist of: 1. Site works to allow access for install of foul wastewater system, 2. Installation of foul wastewater system, 3. Groundworks to landscape site post installation, at
To construct a single storey extension to the existing dwelling house with all associated site development works at
To construct dwelling house and domestic garage with proprietary treatment system and percolation and associated site development works at
Retention Permission for extensions and refurbishing works to existing dwelling, replacement septic tank associated works and services at
Planning permission to construct a single storey extension to the rear of an existing dwelling and to construct a new porch to the front with upgrade of the existing Wastewater Treatment System and all associated site development works
1. Planning Permission to construct extension to side of existing dwelling house. 2. Planning Permission to retain as constructed extension attached to existing domestic garage. 3. Planning Permission to retain as constructed dutch clipped gables that differs to that granted PD/99/479 an all ancillary development works at
The brief summarizes the pattern across all 291 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23404The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief