CONSTRUCTION OF A DWELLING HOUSE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
CLONADERIG , BALLINAHOWN , CO. OFFALY
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 96 nearby planning records within 5 km where a location match is available.
- Matched source
- 23423
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
CONSTRUCTION OF A DWELLING HOUSE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, EFFLUENT TREATMENT AND PERCOLATION AREA AND ALL ASSOCIATED ANCILLARY WORKS
THE CONSTRUCTION OF A FOUR-BAY MACHINERY AND STORAGE SHED AND ALL ASSOCIATED SITE WORKS
Conversion of the attic from storage to habitable living accommodation ancillary to the existing dwelling, including 2no. new dormer windows to the southeast, 1no. dormer window to the south west, 1no. dormer window to the north west at first floor and remove 1no. roof lights from the rear of the house and all associated site works
THE EXTRACTION OF MATERIAL OVER AN AREA OF 0.95 HECTARES AND PLANNING PERMISSION FOR THE RESTORATION TO AGRICULTURAL USE OF THE SAME 0.95 HECTARE AREA
The brief summarizes the pattern across all 96 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 23423The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief