Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 411 decisions within 5 km, 7 exact-site or onsite candidate records, and 30 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
30 structured nearby appeal records.
30 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for Solar PV Energy Development of maximum export capacity 4MW to include photovotaic panels on ground mounted frames/support structures; one ESB Networks substation building with a height not exceeding 5.2m; underground cabling and ducting; 3 no. inverter/transformer/storage stations with a height of 2.7m; perimeter (stock proof) security fencing; security cameras; site access; temporary construction compound
Permission for 1. a total floor area of7536.3m2 part single storey, part 2 storey warehouse facility including, 2. a total of 7111.5m2 ground floor warehouse; 3. a total of 424.8m2 of office and associated staff facilities over 2 floors, 4. an external canopy over part of an existing industrial yard; 5. an extension to the existing industrial yard; 6. PV panels on roof; 7. and all associated site works
EXTENSION OF DURATION OF 17/332 - Permission for development to consist of Solar PV Energy Development of maximum export capacity 4MW to include photovoltaic panels on ground mounted frames/support structures; one ESB Networks substation building with a height not exceeding 4m; underground cabling and ducting; 3 no. inverter/transformer/storage stations with a height of 2.7m; perimeter (stock proof) security fencing; security cameras; site access; temporary construction compound
EXTENSION OF DURATION OF 17/332 - Permission for development to consist of Solar PV Energy Development of maximum export capacity 4MW to include photovoltaic panels on ground mounted frames/support structures; one ESB Networks substation builiding with a height not exceeding 4m; underground cabling and ducting; 3 no. inverter/transformer/storage stations with a height of 2.7m; perimeter (stock proof) security fencing; security cameras; site access; temporary construction compound
Retention and permission: Retention for stoned yard area to rear of site and revised site boundaries, permission for 5 no. grain storage bins and all associated site works *Significant Further Information submitted 12/1/21*
Permission for the reconstruction of the steps to the house entrance, removal of stone cladding to parts of the front walls of the house, new windows, the installation of a carport, the installation of a skylight and photovoltaic panels to the front roof, raising the height of the existing gate entrance piers, erecting gates, constructing a front boundary 1.5M high with gabions and wire mesh, and all associated siteworks
The brief summarizes the pattern across all 411 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23483The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief