Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 190 decisions within 5 km, 3 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of 2 No external sheds and planning PERMISSION for a new covered bunded area, new refrigeration shed, a new external shed and associated site works
Of an above ground wastewater balancing tank and a plant building and PERMISSION for an extension to a refrigeration shed, an extension to a compressor room, a water purification plant building, an above ground 5m water storage tank, an above ground 2,700m firewater storage tank with generator enclosure and associated site works
For the change of use of a section of the existing western warehouse to production, the extension of the 1st floor office into the existing western warehouse, alteration of existing boardroom and associated works
For provision of additional first floor laboratory and office space, associated circulation space and escape / access stairs and new roof plant area at existing permitted eastern warehouse (PL Ref 16/611)
For the construction of a 1.0mW PV Solar Farm. The proposed works will consist of a 1.0mW PV Solar Farm located to the north of the existing facility, with an area of approximately 1.91 hectares, comprising of linear arrays of solar photovoltaic panels on ground mounted frames (with associated cabling and ducting), a modular substation / inverters, hardcore site access road and all associated site works
For the following development: 1. for the construction of a detached domestic garage and new onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works 2. Retention permission for as-built alterations to the dwelling previously permitted (Planning Reference 07/2909 refers) comprising the provision of first floor accommodation, installation of rooflights to the front and rear elevations, together with all associated ancillary and incidental site works
The brief summarizes the pattern across all 190 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23602The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief