Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 309 decisions within 5 km, 4 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To (a) construct a new light industrial building (approx. 2500 sq. m.) (b) upgrade existing sewage treatment system (c) together with all associated site works
To (A) construct 2 no. light industrial units (each 205 sq.m.), (B) research and development building (220 sq.m.), (C) vehicle storage building together with staff facilities area and covered storage area (1169 sq.m.), (D) relocate existing storage tanks on site, (E) erect flood lighting over extended yard area, (F) erect new perimeter retaining wall and security fencing to extend yard perimeter boundary (G) together with all associated site works. Significant further information and revised plans have been submitted
To (a) construct an ESB substation, (b) construct a new light industrial unit attached to and over existing building on site, (c) together with all associated site works Significant further information and revised plans have been submitted.
To (a) install a ground-mounted solar photovoltaic (PV) array consisting of approximately 438 PV panels with a total generation capacity of circa 500kW, (b) install 1 No. inverter building, (c) install underground cabling, and (d) all associated site works- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
For the construction of 1 no. fully serviced single storey dwelling with roof-lights, solar/pv panels, new biocycle unit and percolation area, new well, new entrance, walls and piers and all associated ancillary site works
To construct a single storey extension to the rear of existing single storey dwelling, construct a detached domestic garage, upgrade the existing waste water treatment system and percolation area, together with all associated site works
The brief summarizes the pattern across all 309 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360330The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief