Executive snapshot
9% of nearby decided applications were refused. The site check found 193 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new two storey type dwelling house, domestic garage, new vehicular entrance, proprietary wastewater treatment system and soil polishing filter and all associated ancillary site services
To construct a two storey dwelling (278.9sqm), a domestic garage (45.3sqm) and new domestic entrance onto the public roadway. Permission is also sought to install a Secondary Treatment System and soil polishing filter and all associated site works
Development of a vehicle servicing use. The development comprises the erection of a new garage building (115.5 sqm) for the purpose of providing for vehicle repair and servicing. The works also consist of a perimeter hard surface yard area, the provision of 3 no. parking bays and the installation of an associated new surface water soakaway
RETENTION of roof extension and chimney at the rear of our existing dwelling
Change of use of the existing workshop building to a domestic dwelling. Planning permission is sought for amendments to the structure which will include the following: 1. Increase the height of the existing first floor and roof to allow for building regulations by 834mm 2. Increase the first floor area from 42.1sq m to 88.5 sq m by extending over the existing void area 3. Proposed new windows and alterations to existing windows to north, east & west elevations 4. Increase the height of the chimney to meet building regulations. Permission is also sought for the installation of a packaged wastewater treatment system and polishing filter and all associated site works at the above address
Change the use of the existing workshop/stables building to a domestic dwelling. Planning permission is sought for amendments to the structure which will include the following: 1. Increase the height of the existing first floor and roof to allow for building regulations, for habitable rooms, by 834mm 2. Increase the first floor area from 42.1sq m to 88.5 sq m by extending over the existing void area 3. Proposed new windows and alterations to existing windows to north, east & west elevations 4. Increase the height of the chimney to meet building regulations. Permission is also sought for the installation of a packaged wastewater treatment system and polishing filter and a new domestic entrance onto the public roadway and all associated site works
The brief summarizes the pattern across all 193 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360402The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief