Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 125 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Change of house type granted under P20/548, including all other ancillary site works and services
CONSTRUCT DWELLING HOUSE AND SEPTIC TANK WITH PERCOLATION AREA, INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES.
Demolish of existing dwelling and construction of 1 no. dwelling house and garage, with new wastewater treatment system and soil polishing filter, including all other ancillary site work and services
The development will consist of the demolishing of the existing dwelling house & the construction of a replacement dwelling house previous planning granted under P04/1120. Including all other ancillary site work and services.
(1) Demolish existing derelict storage shed (2) Proposed construction of a loose shed, walled silage slab and cattle handling facility shed along with all associated site works
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DWELLING HOUSE, RETAIN EXISTING GARAGE TOGETHER WITH ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 125 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23683The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief