Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 997 decisions within 5 km, 3 exact-site or onsite candidate records, and 79 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
79 structured nearby appeal records.
79 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two storey extension and retention of a garden room gym
Demolition of the existing side garage and utility which is attached to the existing two storey semi-detached dwelling, the sub-division of existing residential site, the construction of a two storey style detached dwelling with a linked ground floor family flat, 2no. site entrances, new western boundary wall with pedestrian side access gate, revisions to the site layout plan, connection to all public services and all associated site works
The development will consist of: (A)- The Construction of a split-level building with part single-storey and part three-storey school for Árd Rí Community National School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3,591.00m². (B)- The Construction of a two-storey building for St. Ultan’s Special School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs suite, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 4,359.20m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Baker Hall along with additional pedestrian access points to the north and west. Significant further information/revised plans submitted on this application
Permission for retention of a single storey shed for domestic use with rear vehicular access
Development to be retained consists of change of use of attached domestic garage to habitable use including minor alterations and retention of existing single storey extension to the rear of existing garage and dwelling and all associated site works
Permission to retain; (a) part of first floor habitable space to existing dwelling, including rear dormer window. Also including all associated site works
The brief summarizes the pattern across all 997 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23757The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief