Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 1,602 decisions within 5 km, 1 exact-site or onsite candidate record, and 185 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
185 structured nearby appeal records.
185 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
New two storey dwelling, waste water treatment system to EPA standards, new site entrance, driveway and associated site works
(1) Revised site boundaries to previous grant of permission Ref. no. 23/459. (2) The proposed revisions consist of a reconfiguration of the site boundaries, with the Re-location of proposed house, garage, treatment installation and site entrance
Proposed landfill facility consisting of the importation and deposition of insert subsoil and topsoil for land profiling and re-contouring of agricultural land incluidng reseeding when complete, access gravel road and associates works
Revised house design to previous grant of permission ref no 21/926; proposed revisions consist of a 3 bedroom single story dwelling house
1) Two storey dwelling house on family farm 2) Garage 3) Sewage treatment unit and percolation area to EPA guidelines 4) Connection to existing group water scheme 5) New entrance to dwelling house in compliance with sight line regulations 6) All associated site works
Dwelling, installation of effluent disposal system, connection to public water supply and all ancillary site works
The brief summarizes the pattern across all 1,602 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23813The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief