Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 225 decisions within 5 km, 2 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The construction of a single storey side (west) and rear (south) extension to accommodate a master en-suite bedroom and an extended kitchen/dining/living space, plus all associated site works
For single storey extension to house, also retention of racing pigeon loft, also retention of timber fencing at side of house. Revised by Significant Further Information which consists of upgrade of waste water treatment system
(a) The restoration of an existing vernacular type single storey house; (b) Erection of a single storey extension to the rear (south-west) elevation of the existing vernacular type single storey house and (c) The installation of septic tank and percolation area to serve proposed restoration and extension to vernacular type single storey house and all associated siteworks; (d) The relocation of existing septic tank and new percolation area to serve the existing adjoining house
To erect new agricultural storage shed
Demolition of existing service station shop and associated works. Change of use of existing tyre fitting building/motor factors to new service station shop unit complete with single storey extension to front, service yard, stores, toilets, new fenestration, signage and all associated site works. 2no. fuel pump stands & associated works. New fuel pumps canopy over existing & new fuel pumps. Road side signage. Relocation of car wash & associated works. All associated site development works
(1) Retention permission for demolition of existing service station shop and canopy and associated works. (2) Full permission for: (a) Change of use of existing tyre fitting building/motor factors to new service station shop unit complete with single storey extension to front, service yard, stores, toilets, new fenestration, signage and all associated site works. (b) 2 No. new fuel pump stands and associated works. (c) New fuel pumps canopy on footprint of existing canopy. (d) Road side signage. (e) Upgraded drainage and all associated site development works all
The brief summarizes the pattern across all 225 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23917The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief