Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 925 decisions within 5 km, 6 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
64 structured nearby appeal records.
64 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
Habitable ground floor extension to the rear of the existing dwelling house, habitable ground floor extension to the front of existing dwelling house and habitable first floor extension to the rear of the existing dwelling house
Habitable ground floor extension to the rear of the existing dwelling house, Retention of habitable ground floor extension to the front of the existing dwelling house, Retention of habitable first floor extension to the rear of the existing dwelling house
A ground floor front extension which extends the front of the living room space beneath the existing roof overhang, ancillary internal alterations, alterations to front & side elevations and all associated site works.
For a ground floor & first floor front extension which extends the front of the ground floor living room space beneath the existing balcony and also extends the first floor front bedroom in to the first floor balcony (so incorporating external balcony space into internal habitable space) ancillary internal alterations, alterations to front & side elevations and all associated site works
For change of house type to that previously approved under planning permission ABP-314802-22 (22/889) on sites 49 & 50 Hamilton Park Green from a pair of semi-detached 3 & 2 storey dwellings to a pair of two-storey semi-detached dwellings, relocation of dwellings on sites 49 & 50 Hamilton Park Green, and all associated ancillary site-works
For change of house type to that previously approved under planning permission ABP-314802-22 (22/889) on sites 57, 58 and 59 Hamilton Park Green from a terrace of two and three storey dwellings to a terrace of two-storey dwellings, relocation of dwellings on sites 49-56 Hamilton Park Green, relocation of roads and footpaths serving dwellings 49 to 59 Hamilton Park Green and all associated ancillary site-works
The brief summarizes the pattern across all 925 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23941The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief