Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 876 decisions within 5 km, 2 exact-site or onsite candidate records, and 45 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
45 structured nearby appeal records.
45 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To renovate and extend existing derelict cottage
The construction of a new detached dwellinghouse and domestic garage, together with connections to public services and all ancillary site development works
Development consisting of retention of the change of use and conversion of former outbuildings to 2 no. Apartments, retention for 1 no apartment on first floor extension over existing outbuilding and for the enhancement of existing entrance and construction of a new road and all associated site works (this site is within the curtilage of a Protected Structure).
Development consisting of construction of an extension to the front elevation (southern gable). Construction of new window opes to the side and rear gables. Alterations to the existing roof finishes to include provision of solar PV panels. All associated site development works deemed necessary.
Development consisting of the following; construction of dwelling house with connection to public services and all associated site works on site
Development consequent following the grant of outline permission (Ref. PL 20/85) consisting of construction of a new dwelling house with connection to existing public services and all associated landscape works
The brief summarizes the pattern across all 876 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460152The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief