Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 83 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
WORKS TO INCLUDE CONSTRUCTION OF A NEW DWELLING HOUSE, NEW TERTIARY WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA INCLUDING ALL ASSOCIATED SITE WORKS.
THE REPLACEMENT OF APPROX 223M OF EXISTING 2.4M HIGH CHAINLINK FENCING AND ASSOCIATED GATES WITH 223M OF NEW 2.4 HIGH GREEN PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS AT AN EXISTING ABOVE GROUND NATURAL GAS INSTALLATION
1) the retention of changes to previous planning granted under application number P65/56. 2) extension and renovation of an existing dwelling house, 3) construction of domestic garage and upgrade of existing wastewater treatment system and all associated site works at the above address.
CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE, RETENTION AND COMPLETION OF DOMESTIC SHED, UPGRADE OF EFFLUENT TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
CONSTRUCT DWELLING HOUSE AND GARAGE
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM AND FOR ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 83 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460636The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.