Free preview / €49 incl. VAT site brief

Site planning risk brief

Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.
See sample PDF
Opens secure checkout for the €49 incl. VAT site risk brief.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Arklow Shipping HQ , Mill Road North Quay , Arklow

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 560 nearby planning records within 5 km where a location match is available.

Matched source
2460697
Project type
One-off house
Coverage
5 km radius
560Nearby applications
13%Refused
487Conditional grants
10Refusal reasons

Top refusal reasons nearby

Design4
Other2
Residential Amenity2
Procedure Invalid1
Zoning Contravention1

Nearest planning decisions

2460697

Installation of 109.08 KW (512.9M2) of ground mounted Solar PV Array and associated site works and services. Included in this application is a Landscape visual impact assessment (LVIA),an appropriate assessment screening (AA), a site specific flood risk assessment, and a glint & glare assessment

Granted0.0 km31 March 2025
18316

Demolition of existing disused industrial buildings including gas bottle filling plant, warehouse, administration offices, site office, security office and store of total floor area 2035 sqm.

Granted0.0 km11 May 2018
20615

Modifications to the previously approved planning permission reference 19/368 comprising: • Relocation of the previously approved external plant room to a new position adjacent to the southwestern site boundary. • Provision of a 42sq.m steel storage and maintenance shed. • Reconfiguration of the site plan including access roads and ramps within the site, updated landscaping proposals, hard and soft landscaping; and all associated ancillary site works. • Reduction of the overall car parking numbers from 90 no. to 80 no. (including 5 no. accessible spaces). • Reduction in the overall building height by 600mm. • Minor design changes to the elevations generally including the western stair core, ground floor store area, former external plant area, former balcony at second floor. • Enclosure of the 36sq.m former balcony space at level 2 to form an internal meeting room / office space, with an openable glazed screen and handrail. All on a c.0.88ha. site

Granted0.0 km21 August 2020
19368

Landmark 3 no storey commercial office building with a total gross floor area of c 2519 sqm including all associated plant, a new main entrance onto Mill Road along the northern boundary, a new service entrance onto Mill Road along the eastern boundary, an internal road network to serve an associated apron car parking area comprised of 90 no car parking spaces (*including 5 no accessible spaces), 20 no bicycle parking spaces, a temporary on site wastewater treatment plant, lighting, hard and soft landscaping, and all associated ancillary site works all on a 0.88 ha site. A Natura Impact Statement accompanies the application

Granted0.1 km29 July 2019
191272

Entrance onto North Quay / Marina Road to the rear of their existing premises and all associated site works

Granted0.1 km12 March 2020
23381

Demolition of the existing three storey detached office building (646 sqm) and single storey outbuilding (30 sqm); and the construction of a new five storey apartment block (3,196 sqm GFA) comprising of 34 No. apartments (14 No. one-bed apartments and 20 No. two-bed apartments, all with balconies on the southwest façade) The development will also consist of: ESB substation and switchroom; waste storage areas; plant; bicycle parking; 34 No. car parking spaces; SUDs (including green roof); associated hard and soft landscaping; the creation of 2 No. new entry/egress points off North Quay; all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments, and associated site servicing (foul and surface water drainage and water supply)

Granted0.2 km18 August 2023

The brief summarizes the pattern across all 560 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Site-specific risk summary

Site brief

Source evidence

Site brief

Comparable decision set

Site brief

Next-step checklist

Site brief
Ready to get the site risk brief?€49 incl. VAT once-off PDF, no account required