Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 971 decisions within 5 km, 3 exact-site or onsite candidate records, and 70 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
70 structured nearby appeal records.
70 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (i) a revised site layout comprising of a revised forecourt layout, revised car parking layout & revised underground fuel tank farm location. (ii) The provision of a new larger canopy over the existing forecourt area. (iii) The provision of a single storey extension to the side and front of the existing service building comprising of a seating area ancillary to the shop services. (iv) The provision of a single storey extension to the side of the existing service building comprising of a storage area ancillary to the shop services. Gross floor space of proposed works 102.33 sqm
Consisting of the demolition of existing storage buildings to facilitate the construction of a light-industrial manufacturing facility. Works include the provision of a single storey production area with ancillary offices and laboratory areas and all other supplementary areas constructed over two-stories with a combined gross floor area of 677m2. Other works include the realignment of the boundary wall to aid visibility to the R381 junction, the reconfiguration of the existing vehicular site entrance, the construction of a car park adjacent to the proposed building to provide 15no. spaces, the provision of a deliveries compound with perimeter screened fencing to the rear of the proposed building, an external open-sided storage enclosure, external bulk storage tanks, a plant and services compound, signage to the proposed building and wayfinding signage to the R381 junction, rainwater and wastewater attenuation tanks, plant and photovoltaic units to the roof level with all ancillary landscaping and associated site works and services. Gross floor space of proposed works: 677 sqm. Gross floor space of any demolition: 384.7 sqm
For (1) demolition of existing weighbridge, single storey weighbridge office, & single storey office buildings; (2) reorganisation of the internal site layout to facilitate enhanced operational arrangements of the permitted processing & temporary storage of waste metal prior to onward transfer with an annual throughput of 60,000 tonnes per annum including development consisting of: (i) construction of a new weighbridge & office; (ii) construction of a new stores building with ancillary administration & employee welfare/rest facilities; (iii) modifications to existing internal access road & internal site access/egress; (iv) provision of new separate storm & foul water collection systems including: (a) connection & discharge to public foul mains; (b) discharge of surface water to existing outlets; (c) connection to public water main; & (d) provision of surface water management attenuation works including provision of underground storage tanks & interceptors; (v) provision of new metal shearing plant; (vi) esb substation; (3) provision of a new 6m high boundary fence & associated landscaping; & (4) all associated site development works
For the construction of an extension to the existing facility, as a storage unit, and all associated site services. Gross floor space of proposed works: 550 sqm. Gross floor space of any demolition: 55 sqm
For alterations to the development previously permitted under Pl Ref. 2460991 at the site of the existing transfer station facility; (i) the replacement of the single vehicle entrance door permitted for the eastern elevation of the transfer station building extension with two vehicle entrance doors, (ii) the partial removal of the existing wall separating the existing and permitted building areas, and (iii) repositioning of the permitted personnel access doors. Construction of the eastern elevation of the permitted development (GCC ref 2460991) will not commence until such a time as a grant of planning for the proposed development is received. The development comprises an activity subject to an existing Waste Licence (EPA reference no. W0148). Gross floor space of proposed works: 1,038 sqm
Consisting of alterations and additions to an existing materials Recovery Facility (register references 13/1350 and 16/412 to accept increased tonnage of waste from previously permitted limit of 22,000 tonnes per annum to 50,000 tonnes per annum. The development will also include the introduction of liquid waste treatment onto the site. The development will include the construction of four liquid waste, bunded storage tanks and on-site liquid waste treatment plant. Permission is also sought for all associated works and services. Gross floor space 3033sqm.
The brief summarizes the pattern across all 971 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460978The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief