Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 272 decisions within 5 km, 1 exact-site or onsite candidate record, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development consisting of a solar farm development comprising of: the installation of photovoltaic panels on ground mounted frames in rows; a 38kV ESB electricity substation compound including a single storey substation building and electrical infrastructure; up to 23 no. single inverter stations (or an alternative string inverter provision); ducting and underground electrical cabling; provision of some new internal access tracks and use of some existing agricultural tracks; storage containers; perimeter fencing; pole mounted CCTV cameras; vehicular access via existing private roads that connect directly to the L50783; construction of 2 no. passing bays along the L50783 and all associated site development and landscaping works. All on a site of approximately 37.97 hectares. The solar farm will have an operational lifespan of 40 years and an estimated export capacity of 30MW approx. of electricity. Planning permission is sought for a duration of 10 years at
Permission for the construction of a new roofed manure pit, roofed handling facility and enclosed dry bedded shed along with all associated site works at
Permission to construct agricultural building together with ancillary concrete and all associated site works at
Permission for development consisting of the construction of 30 no. houses comprising 4 x 3 bedroom detached, 10 x 4 bedroom semi-detached and 16 x 3 bedroom semi-detached, public open space, parking, landscaping, boundary treatments and all associated site works at
To form new access onto public highway and associated works at
Permission for a warehouse/storage extension to the existing Retail Unit No. 6, together with connection to existing services and all associated site development works. The extension will provide additional internal storage space, including for the secure storage and charging of battery-powered equipment, total proposed area 512 sq.m at
The brief summarizes the pattern across all 272 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560026The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief