Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 89 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct an extension at side of gable, with elevational changes, decommission existing septic tank and replace with a Tricel P6 wastewater treatment tank and Tricel Tero module on a gravel bed and all associated site works
Construct a new dwelling house, install a mechanical treatment unit, polishing filter and all associated site works.
Permission to A.) Demolish existing rear flat roof extension B.) Construct new rear extension C.) Construct porch extension to front of existing dwelling house D.) Elevational changes E.) Decommission existing septic tank and install a mechanical treatment tank and percolation area and all associated site works
(a) retention permission to retain the demolition of the existing old dwelling house and to retain partially constructed new dwelling house, and (b) permission to demolish the remaining part of the existing old dwelling house, complete the construction of the new dwelling house, and to decommission the existing septic tank and install a new mechanical wastewater treatment system with sand polishing filter, and all associated site works.
CONSTRUCT A DWELLING HOUSE SERVED BY AN EFFLUENT TREATMENT TANK AND POLISHING FILTER
(A) RETAIN STORAGE BUILDING AS CONSTRUCTED AND (B) RETAIN CHANGE OF USE OF STORAGE BUILDING TO A SHORT TERM LETTING HOLIDAY HOME (C) RETAIN SEPTIC TANK AND PLANNING PERMISSION TO INSTALL A PURAFLO TYPE POLISHING FILTER WITH THREE PODS UNITS
The brief summarizes the pattern across all 89 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560818The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief