Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 422 decisions within 5 km, 4 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For demolitions and alterations to an existing dwelling to include: (1) new first floor level to the existing dwelling; (2) a new single storey extension to the rear; (3) new garage, and (4) all associated site works
(a) Retain single storey sun room extension to side of house; (b) Retain garage to front of house and (c) Retain outbuilding to rear of house
Raising pillars, erecting railings, and gates to front and part side boundaries of house
STRATEGIC HOUSING DEVELOPMENT (ABP DECISION): Demolition of detached, vacant cottage(gfa 69sqm) and the construction of 298 residential units (181 no. dwellings and 117 no. apartments), childcare facility and foul pumping station along with associated ancillary works and site works.
For development on c.5.47 ha site. This application forms Phase 2 of a 3 phase residential development on an overall landholding with an area of c.9.29 ha. The proposed Phase 2 development will consist of: 95 no. 2 storey houses to be provided as follows: • 7 no. 2 bed two storey mid & end-terrace houses (House Type T1c); • 32 no. 3 bed two storey mid-terrace houses (House Type R2c-Mid); • 15 no. 3 bed two storey end-terrace houses (House Type 6c); • 21 no. 3 bed two storey end-terrace houses (House Type R2c-End); • 4 no. 3 bed two storey semi-detached houses (House Type House Type N1); • 16 no. 4 bed two storey semi-detached houses (House Type O1). o A total of 151 no. surface car parking spaces are proposed to serve the houses. A total of 78 no. secure long-stay cycle parking spaces are proposed for residents; o The development includes cycle paths, footpaths, and internal roads, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands; o Provision of new vehicular accesses off the R148 and the R158, a new footpath along the R148, and the provision of a link street from the R158 to the boundary of the adjoining Bawnogues Park residential development to the south east of the subject site; o The development includes foul and surface water drainage, including attenuation system, bin stores, public and communal open space, public lighting, landscaping and boundary treatment works, services and all associated and ancillary site works and development
For new stairs and the conversion of attic space into a bedroom & ensuite along with 5 no. rooflights to the front roof
The brief summarizes the pattern across all 422 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561471The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief