Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 658 decisions within 5 km, 3 exact-site or onsite candidate records, and 55 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
55 structured nearby appeal records.
55 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a detached one and a half storey house, single storey domestic garage, installation of a secondary effluent treatment system, recessed entrance and all associates site works. The development is within the curtilage of a protected structure "Bohereen House" (REF: B14-40)
Single storey extensions to the front (South Facing Elevation), side (East Facing Elevation) & rear (North Facing Elevation) extensions with alterations to an existing bungalow to include, new front porch, kitchen, utility room with a shared En-suite & orangery to the rear of the dwelling. Change of use a domestic garage to bedroom with shared En-suite, which will be included as part of this extension proposal to the North and all associated site works
Removal of existing stone arch and chimney to form new entrance feature with side window and small extension into existing porch area. Replacement of all windows, attic conversion with 4 no. rooflights, small rear extension and internal modifications. Revised by significant further information consisting of; 1. Regularise wastewater treatment system by seeking retention planning permission in respect of same. 2. Omission of 2 rooflights.
1. The change of use of an integrated garage for use as habitable space (c.14.2sqm) and the provisions of associated windows to the front (north) and side (west) elevations; 2. The conversion of the attic for use as habitable space (c.63sqm) and 3. associated alterations to the roof including an increase in the ridge height by c.600mm, the provision of 7no. Velux windows and an increase in the height of the chimney by c.1.1m
To (1) Construct a bay window to the front. (2) Demolish an existing sunroom to the rear. (3) Construct a new extension to the rear. (4) Replace and relocate existing septic tank system with a secondary waste water effluent treatment system with a tertiary sand filter and percolation area. (5) The sunroom demolition area is 12.66sq.m. The bay window will add 1.44sq.m. The rear extension will add 39.17sq.m. (6) Various alterations to the existing floor layout
For 1) To construct a detached structure in the garden to the rear of our house that will incorporate a garden shed and a home gym area with shower room. 2) All ancillary groundworks associated with the above
The brief summarizes the pattern across all 658 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561477The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief