Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 179 decisions within 5 km, 4 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) Change of use of former convent building, chapel and outbuildings to a) aparthotel use providing 12 no. rooms on first and second floor and b) cafe, restaurant and reception use on the ground floor. 2) To construct new lift and single-storey kitchen extension to the rear of the building. 3) To construct glass porch and covered outdoor seating area adjacent to proposed café to South elevation. 4) To construct link corridor connecting the convent building to existing outbuildings. 5) Provision of on-site car parking, connection to all public services and all ancillary site works.
Change of use of Scoil Naisiunta Bhrid Naofa to St. Brigid's Parish Centre and office and associated works including existing site boundaries
CHANGE OF USE FROM SCHOOL HOUSE INTO 4.NO. APARTMENTS AND ASSOCIATED ANCILLARY WORKS.
(a) provide a pitched roof over a section of the Parochial house, which at the present is covered by a flat roof, and erect an extension to rear of the house; (b) retain revised vehicular entrance including the construction of stone wing walls and pier, and carry out all associated works
1.Change the use of building from light industrial to warehouse/ tile showroom, 2. Change the use of part of the site/open yard to allow for storage of commercial passenger vehicles, 3. The erection of commercial signage adjacent to the site entrance and on the front facade of the building, 4. Retention of all elevational amendments made subsequent to the initial construction, 5. Retention of external loading ramp and dock, 6. Retention to construct walls and roof to enclose loading ramp and dock, 7. Retention of change of northwest facade to steel cladding from cement render, 8. Retention to construct a new entrance gate to secure the yard.
Two number two-storey 3 bed semi-detached houses, connect to existing mains services, site development works, removal of underground tanks and all ancillary works.
The brief summarizes the pattern across all 179 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660123The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.