Planning permission for the demolition of existing structures on site and the construction of a new 2 storey dwelling, site entrance, treatment system and all ancillary site works.
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Ballymartin , Borris , Co.Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 239 nearby planning records within 5 km where a location match is available.
- Matched source
- 183
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Erection of a dwelling house, garage, treatment system and percolation area and all associated site works
Construct a single storey dwelling with first floor dormer windows to the front elevation, on top of the already constructed base/substructure as granted planning 07/983, also new detached garage, and proprietary effluent treatment system with percolation area and all associated site works
The construction of a new two story dwelling house, domestic garage, domestic well, onsite waste water treatment plant and percolation area along with all associated site and landscaping works including a new entrance
Domestic garage/store and all associated site works
For PL21/373 for the construction of a single storey type dwelling with effluent treatment system & percolation area with new vehicular entrance and all associated site works
The brief summarizes the pattern across all 239 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 183The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief