PERMISSION for Phase 2 of a residential development consisting of the construction of 99 no. residential units and all ancillary development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting and amenity areas. The proposed development will allow for the laying of roads and services for a portion of Phase 1 and all of Phase 2 located to the east and west of the existing access road. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the planning application
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
The Paddocks , Williamstown Road , Grantstown
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 1,543 nearby planning records within 5 km where a location match is available.
- Matched source
- 21976
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Phase 1 of a residential development consisting of the construction of 99 no. residential units, 1 no. childcare facility, 2 no. ESB substations and all ancillary development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting and amenity areas. The proposed development will allow for the laying of all roads and services for the Phase 1 and Phase 2 located primarily to the east of the existing access road. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the planning application
Phase 2 of a residential development consisting of the construction of 99 no. residential units and all ancillary development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting and amenity areas. The proposed development will allow for the laying of roads and services for all of Phase 1 and Phase 2 located to the east and west of the existing access road. The proposed development works include a connection to and the construction of a new storm water sewer on the Dunmore Road which is associated with Island View pumping station. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. A Natura Impact Statement (NIS) has been submitted to the planning authority with the application
For Phase 4A of a residential development consisting of 79 no. units, a creche, 1 no. ESB Substation and all associated site development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting, bin stores and amenity areas at ‘The Paddocks’, Williamstown Road, Grantstown, Co. Waterford. The proposed development forms part of a Masterplan which will provide for 305 no. units and 1 no. creche and seeks to modify parts of the previously permitted Phase 1 (ref. no. 21/833 & 23/60056) and Phase 2 (ref. no. 22/653) and supersede Phase 3 (ref. no 22/466). The proposed modifications to Phases 1 and 2 include alterations to the site layout to the west of the primary access road that will replace all elements of the permitted layout including the creche and residential units. This will result in a total of 133 no. units to the east of the primary access road being constructed under the Phase 1 and 2 permissions. The proposed modifications to the site layout plan also include amendments to the internal layout of the permitted public open space. The proposed development works include the construction of a new storm water sewer on the Dunmore Road which is associated with Island View pumping station. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Phase 3 of a residential development consisting of the construction of 14 no. residential units, 1 no. childcare facility, 1 no. ESB substation and all ancillary development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting and amenity areas. The proposed development works include a connection to and the construction of a new storm water sewer on the Dunmore Road which is associated with Island View pumping station. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. A Natura Impact Statement (NIS) has been submitted to the planning authority with the application
For Phase 4B of a residential development consisting of 93 no. units, 2 no. ESB substations and all associated site development works including access, footpaths, cycle paths, parking, drainage, landscaping, lighting, bin stores and amenity areas at ‘The Paddocks’, Williamstown Road, Grantstown, Co. Waterford. The proposed development forms part of a Masterplan which will provide for 305 no. units and 1 no. creche and seeks to modify parts of the previously permitted Phase 1 (ref. no. 21/833 & 23/60056) and Phase 2 (ref. no. 22/653) and supersede Phase 3 (ref no. 22/466). The proposed modifications to Phase 1 and 2 include alterations to the site layout to the west of the primary access road that will replace all elements of the permitted layout including the creche and residential units. This will result in a total of 133 no. units to the east of the primary access road being constructed under the Phase 1 and 2 permissions. The proposed modifications to the site layout plan also include amendments to the internal layout of the permitted public open space. The proposed development works include the construction of a new storm water sewer on the Dunmore Road which is associated with Island View pumping station. Access to the site will be via the existing entrance onto Williamstown Road to the south of the site. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application. The EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
The brief summarizes the pattern across all 1,543 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 21976The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief