TO CONSTRUCT AN OFFICE BUILDING AND A BOAT STORAGE FACILITY CONNECTING TO AN EXISTING EFFLUENT TREATMENT SYSTEM. TO CONNECT THE SEWERAGE FROM THE EXISTING HOLIDAY ACCOMMODATION TO THE EXISTING EFFLUENT TREATMENT SYSTEM SERVING AASLEAGH LODGE
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
SRAHATLOE , LEENANE , CO. MAYO
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 43 nearby planning records within 5 km where a location match is available.
- Matched source
- 18682
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
INSTALL 3 NO. ANTENNAS AND 2 NO. DISHES AND FRAME SUPPORT TO THE EXISTING PERMITTED ANTENNA SUPPORT STRUCTURE. P09/1171 REFERS. IN ORDER TO FACILITATE THE DECOUPLING OF THE IN-SITU H3GI SHARED ANTENNAS ON BEHALF OF EIR MOBILE, TOGETHER WITH ASSOCIATED CABINETS
Redevelopment of research facilities with ancillary works, the application is accompanied by a Natura Impact Assessment
Retain and carry out alterations to an existing effluent treatment system
Retain a two storey double garage and a garden shed, and permission to install a tertiary effluent treatment system
To construct an extension to the side of the dwelling and to retain a utility garage to the rear of the dwelling. Gross floor space of proposed works: 38 sqm. Gross floor space of work to be retained: 56.6 sqm
The brief summarizes the pattern across all 43 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 18682The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief