Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 164 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Erect a four bay slatted shed to include underground tank, creep area and feeding passage, and all associated works
Construction of a dwelling house, domestic garage, new entrance onto the public road, onsite wastewater treatment system with connections to services and associated site development works
(1). construct a single storey domestic extension to the rear of the existing domestic dwelling.(2.) To construct a new porch on the front elevation of the existing dwelling. 3. To construct a domestic garage and all ancillary works.
1. To construct a part two story/ part single storey domestic dwelling. 2. To construct a domestic garage. 3. To construct a new site entrance. 4. To construct a new Waste Water Treatment System to current EPA Code Of Practice and all ancillary works.
(a) demolition of partially constructed two storey type dwelling house; (b) decommissioning of existing septic tank with soak-pit servicing existing partially constructed two storey type dwelling house; (c) proposed construction of a two storey type dwelling house, detached garage, entrance, boundary fence/wall, suitable wastewater treatment system with polishing filter and all ancillary works
The development will consist of (a) a Two Storey side extension, (b) Demolition of one front porch, one chimney structure and one rear single storey extension with (c) New relocated replacement P.I.A. approved Wastewater Treatment System c/w Tertiary Treatment Unit & Polishing Filter, to EN 12566-7, with all associated site works required.
The brief summarizes the pattern across all 164 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2084The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief