Altering and amending the following items granted under planning reference number 21710, to amend house type and location of treatment system, complete with all associated site works to serve proposed new two storey dwelling
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Skeheenaranky , Burncourt , Co. Tipperary
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 149 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460704
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Dwelling, garage and effluent treatment system using existing entrance and all associated site works
A single storey dwelling including: exercise therapy pool, home gym, therapy room, carport, detached domestic garage & storage shed, vehicle access, wastewater treatment system & associated site works
Detached domestic garage and for dwelling house which was constructed larger and in a different position than that granted under Planning Reference 00/798. This application also includes retention of "the as constructed" site boundaries, entrance gates and associated surface water cut off drainage and paved area between the recessed roadside boundary and public road edge
(i) rear extension and 2 no. roof lights to eastern wing of dwelling (ii) detached domestic garage/store
The construction of a domestic garage and all associated site works
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2460704The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief