CONSTRUCTION OF A NEW TWO STOREY DWELLING, DOMESTIC GARAGE / FUEL STORE, INSTALL PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
TOBERRONAN , DAINGEAN , CO OFFALY
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 143 nearby planning records within 5 km where a location match is available.
- Matched source
- 18148
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
THE CHANGE OF USE OF THE FIRST FLOOR AREAS OF THE PREVIOUSLY APPROVED GARAGE, UNDER PLANNING PERMISSION REFERENCE PL2/17/167, FROM STORAGE TO GYM AND MODEL-MAKING WORKSHOP WITH KITCHENETTE AND WASHROOM ANCILLARY TO THESE PROPOSED USES AND ALL OF WHICH, ARE INCIDENTAL TO THE ENJOYMENT OF THE EXISTING DWELLING HOUSE. PERMISSION IS ALSO SOUGHT TO RETAIN AND PERMANENTLY RESTRICT THE THREE EXISTING ROOF-LIGHTS WITH EXTERNAL GUARDING AND TO INSTALL OPAQUE GLAZING IN ORDER TO PERMANENTLY ELIMINATE THE ABILITY TO VIEW THE OUTDOORS FROM THE FIRST FLOOR OF THE PREVIOUSLY APPROVED GARAGE
A DWELLING HOUSE, GARAGE, WASTE WATER TREATMEMT SYSTEM AMD ALL ANCILLARY SITE WORKS.
AN EXISTING STORAGE SHED FOR DOMESTIC USE
THE CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE OF AN EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
The construction of a new dwelling, garage, septic tank, percolation area, entrance, and all associated site works
The brief summarizes the pattern across all 143 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 18148The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief