To construct 1 no. Free Range Poultry House, together with all ancillary structures (to include meal storage bin(s), soiled water tank(s) and associated site works (to include new/upgraded site entrance). Gross floor space of proposed works: 1522 sqm
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Blindwell ,
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 117 nearby planning records within 5 km where a location match is available.
- Matched source
- 19110
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
For the retention and completion of a two storey rear extension, single storey front extension, alterations to existing dwelling house and ancillary works. Gross floor space of proposed works: 53.35 sqm. Gross floor space of work to be retained: 53.35 sqm
Of "as constructed" serviced dwelling house and domestic garage/store on revised site boundaries (previous planning ref.no. 05/2542). Gross floor space of work to be retained: House 226 sqm, Garage 41 sqm
To construct a new agricultural entrance/exit gate and all ancillary site works
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ANCILLARY SITE WORKS
RETENTION OF CALF HOUSE AND MILKING PARLOUR. CONSTRUCTION OF CUBICLE SHED WITH ASSOCIATED UNDERGROUND SLATTED TANK. CONSTRUCTION OF SILAGE PIT AND ALL OTHER ASSOCIATED SITEWORKS.
The brief summarizes the pattern across all 117 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 19110The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief